| Copyright NORWICH CITY FOOTBALL CLUB - WORKS TO BARCLAY STAND, CONCEPTS ![]() Photograph: Teather Walls Architects Ltd. Project: Works to Barclay End Stand, Norwich City FC. Architects: Teather Walls Architects Ltd. Norwich City FC | Concepts |Components | Junctions | Details The close season programme required a system which achieved a watertight envelope at levels 2 and 3 within a matter of 8 weeks from start on site. Due to the use of the building a vandal resistant construction was required at ground floor. The base is constructed of high quality blockwork with an integrated panel system at levels 2, 3 and 4 incorporating aluminium cills and copings all secured to a steel frame. CONTACT Christopher Walls RIBA Tel +44 (0)1603 879880 Email admin@twa.co.uk |