Adjust Text Size
A A A
Colour Scheme
A A A A
Accessibility Options

Belfast Odyssey Millennium Project

Photograph: Esler Crawford Photography. Arena Architects: Marshall Haines Barrow Ltd.
President Clinton at Belfast Odyssey Arena - December 2000.  Arena Architects: Marshall Haines and Barrow Ltd.  Photograph: AP
Photograph: Marshall Haines Barrow Ltd. Virtual Image (inset): Teather Walls Architects Ltd./meme

Cladding Consultancy Services for Belfast Odyssey Arena, Landmark Millennium Project for Northen Irteland

 

'A design intent performance specification sets out the base line requirements for a project whilst allowing the specialist engineering skills of the sub-contractor to be fully utilised. This approach is embedded in our procurement philosophy and has resulted in a number of projects which have won craftsmanship awards'  Andrew Teather and Christopher Walls


 

 

10,000 Seat Indoor multi-event facilty for ice hockey, athletics and basketball

 

Teather Walls Architects were asked to assist in facilitating a commerically viable approach to the cladding of this project.  We produced a draft design intent performance specification based on the document we produced for the Lotus Cars' Research and Development Centre, and introduced Prince Cladding BV to the Design Team.  Prince Cladding BV were a speclalist dutch based cladding company with skilled 'in house' engineers and were subsequently awarded the project.

 

A design intent performance specification sets out the base line design requirements for a project whilst allowing the specialist engineering skills of the sub-contractor  to be fully utilised. This approach is embedded in our procurement philosophy and has resulted in a number of projects which have won craftsmanship awards.